PV SOILING LOSS · CLEANING PAYBACK

Korea based: the default yield values come from PVsyst results at Korean sites and amounts are in Korean won (KRW). The formulas apply anywhere if you enter your own rate and yield.

Solar Panel Cleaning Payback Calculator (soiling loss and cleaning cost)

Cleaning payback sheet

※ Fill in the yellow boxes only. Set the soiling loss % from how much lower the output was just before cleaning than just after (same weather), or against the same month last year.

■ 1. Inputs

Frequently asked questions

How much output do dirty solar panels lose?

The IEA PVPS Task 13 report (IEA-PVPS T13-21:2022, published January 2023) estimates that soiling cuts yearly solar output worldwide by 3 to 5%, with economic losses on the order of 3 to 5 billion euros a year. Dust, bird droppings, pollen and yellow dust, and how often it rains, vary a lot from site to site, so the most accurate value for your plant comes from comparing output before and after cleaning.

How often should panels be cleaned?

Only when the cleaning cost is less than the money lost to soiling. If the real loss is above the break even soiling loss % from this calculator, cleaning is worth it; if below, waiting for rain is better. More cleanings (⑥) mean more cost, so timing them for the dirtiest season (for example heavy pollen or yellow dust with little rain) is most efficient.

What rate should I enter?

If you sell the power, enter the SMP plus REC amount per kWh from your settlement statement. For self consumption, enter the energy rate per kWh of the electricity you avoid buying. Under net metering, enter the rate by which netting lowers your bill.

How do I find the specific yield per kW?

Divide last year's output from your monitoring system by the installed capacity (kW). Without data, refer to our 2026 PVsyst results at 8 Korean sites (roofs 1,169 to 1,322, ground mounted 1,255 to 1,367 kWh/kWp).

Can I clean the panels myself?

While the sun is up the DC side stays live even with the inverter off. Do not touch broken modules or exposed wiring, and avoid pressure washers and stiff brushes, which can damage the coating and frame seals. Rooftop work needs fall protection and trained people.

Notes (sources checked 2026-11-11) Not included: how fast soiling builds up again after cleaning (loss changing over time), losses cleaning cannot recover (staining, coating degradation), rate changes, VAT.
Call +82 1555-2859Email us

☎ +82 1555-2859 · www.ecokkorea.kr · info@ecokkorea.co.kr

One A4 page with the inputs and results