KOEN

Agrivoltaics in Korea under the new act

Eligibility, design criteria and yield, read from the law effective December 17, 2026.

Short answer

Agrivoltaics is set in law for the first time by the Act on the Promotion and Support of Agrivoltaic Power Generation Business (영농형 태양광 발전사업의 활성화 및 지원에 관한 법률) (Act No. 21804), which takes effect on December 17, 2026. Eligible operators are farmers who live in the town (eup, myeon or dong) or an adjoining one and can prove three years of farm management, cooperatives of 10 or more residents, and agricultural corporations in renewable energy zones (Article 5). Sites are farmland outside agricultural promotion areas or farmland in renewable energy zones (Article 6). The period is set by the mayor or county head within 30 years from the permit date (Article 7). Draft enforcement decree and rules (pre-announced on September 16, 2026, not final) include a shading ratio under 30% and a minimum structure height of 2.5 m. ECO K KOREA in Naju, Jeollanam-do takes a lot number and reviews site regulations, a layout matched to the shading ratio, and PVsyst yield together. Phone +82 1555-2859.

Who, where and for how long

ItemText of the actArticle
OperatorFarmer living in the town or an adjoining one with three years of proven farm management; cooperative of 10 or more residents; agricultural corporation in a renewable energy zoneArt. 5
SiteFarmland outside agricultural promotion areas or in renewable energy zones (resident cooperatives may use other farmland after consultation with the agriculture ministry)Art. 6
PeriodSet by the mayor or county head within 30 years from the permit dateArt. 7
PermitGranted by the mayor or county head after hearing residents, decided within 30 days of application, excluding the consultation period with the agriculture ministryArt. 8
FarmlandA generation business permit counts as a temporary farmland use permitArt. 10

Act on the Promotion and Support of Agrivoltaic Power Generation Business (영농형 태양광 발전사업의 활성화 및 지원에 관한 법률), Act No. 21804, promulgated June 16, 2026, effective December 17, 2026 (six months after promulgation). Text checked at the Korean National Law Information Center on 2026-11-11.

Design criteria (draft)

ItemDraft enforcement decree and rules (pre-announced September 16, 2026)
Shading ratioUnder 30%
Minimum structure height2.5 m or more
Support spacing4 m or more on center
Facility areaWithin 10% of the site
CultivationAt least 80% of the site every year
Not confirmedArea and capacity limits, restricted crops

The draft is not final and must be checked again when promulgated.

Figures from a design of about 1 MW

ItemDesign on about 4,700 pyeong of coastal farmland in Jeonnam
Capacity986.40 kWp (4,110 bifacial 240 W modules, 25° tilt)
Clear height4 m under the modules (room for tractors and combines)
Shading ratio29.1%
PVsyst first year yield1,348,644 kWh
Specific yield1,367 kWh/kWp (3.75 hours a day on average)
Performance ratio87.0%
EarthworkNo cut or fill; column lengths follow the ground

Design review stage, not a completed project.

Why construction costs more

  • Lifting modules to about 4 m makes columns and beams longer.
  • Lifting equipment, safety measures and foundation pull out tests are added.
  • Cost varies widely with height, tracking and the scope of electrical work. Actual cost needs a quote for each site.

Questions

QuestionAnswer
Can I get an agrivoltaic permit now?The act takes effect on December 17, 2026. Before that there is no permit under this act, so ask the city or county about the procedure first.
Can it go on rice fields in agricultural promotion zones?In principle, farmland outside agricultural promotion areas and in renewable energy zones. Cooperatives of 10 or more residents may use other farmland if the city or county consults the agriculture ministry (Art. 6(2)).
Can I lease the land?Yes. The landlord's consent is needed (Art. 8(1)), and while the permit is valid the landlord cannot refuse lease renewal without just cause (Art. 18).
What if I stop farming?You must farm every year as in the farming plan (Art. 13). Otherwise correction orders, suspension or cancellation, and penalty surcharges (up to KRW 500 million, or three times the gain if that is larger) can follow (Arts. 14 to 16).
Is the yield lower than normal solar?Less capacity fits on the same land because of the shading limit. But bifacial modules lifted high receive reflected light on the rear, so yield per kW did not drop (1,367 kWh/kWp in the design).

Send us the drawings and we can start

We reply with the scope and schedule first.

CallEmail us