Design calculators
Free to use, no sign up. Results are for reference; actual design needs site conditions checked. Three calculators have an English screen (Korean tariffs, amounts in KRW); the others are in Korean.
Solar net metering savings
Monthly and yearly bill savings and payback from solar kW and monthly use, for homes, shops and factories in Korea
OpenFactory ESS peak shaving payback
Demand charge savings, night charging arbitrage and a 20 year payback range by ESS size, KEPCO industrial (B)
OpenSolar panel cleaning payback
Electricity and money lost to soiling, months to recover a cleaning and the break even soiling loss
OpenLighting calculation
Number of luminaires and average illuminance by the lumen method
Open (Korean)Fire detectors
Number of detectors from floor area and ceiling height
Open (Korean)Protection relay coordination
How a relay setting report is put together
OpenPV string sizing
Modules per string from module and inverter data
Open (Korean)DC fuse check
Combiner box fuse and cable ratings
Open (Korean)Lesson files
PVsyst and Solar Pro lesson cards, a practice file and sample reports
Get