KOEN

Electrical design and calculations

Design and BOQ come from one team, so drawings and quantities stay consistent.

Scope

Design drawings

  • Single line diagrams and substations
  • Feeder, power, lighting and receptacle layouts
  • PV, ESS and EV charger interconnection

Calculation reports

  • Protection relay coordination (fault current, settings, TCC)
  • Voltage drop (KEC 232.3.9)
  • Lighting (lumen method, KS A 3011 illuminance)

Delivered with the design

  • Construction BOQ, from cost summary to unit price analysis
  • Quantity take-off sheets
  • Documents arranged for permitting

What to send us

  • Architectural drawings
  • Equipment capacities and specifications
  • Single line diagram, if available

Real deliverable formats

Built from test inputs with no client data.

Motor control center wiring diagram
Motor control center wiring diagram
Time current coordination curves
Time current coordination curves
Combiner box rating review
Combiner box rating review
Panelboard wiring diagram and load schedule
Panelboard wiring diagram and load schedule

More on protection relay coordination reports

Facilities we have designed

Sewage and wastewater treatment plants, water treatment plants and reservoirs, intake and pumping stations, incineration and landfill sites, roads and tunnels, railways and urban transit, airports, telephone exchanges, building electrical, landscape lighting, instrumentation and control, energy audits, renewable energy, power cable tunnels

Design deliverables such as design drawings and relay setting reports are issued under ECO PLANT, which holds the design license.

Send us the drawings and we can start

We reply with the scope and schedule first.

CallEmail us