KOEN

Fire alarm and telecom drawings and BOQ

We coordinate fire alarm and telecom work together with the electrical design.

Scope

Fire alarm

  • Automatic fire detection systems (detectors, conduit, wiring)
  • Design, change order and as-built BOQ

Telecom

  • CCTV
  • Access control
  • Structured cabling

What to send us

  • Floor plans
  • Room use and ceiling height
  • Telecom equipment list

Facilities we have done

  • Fire station annex, fire alarm and telecom
  • Elementary school electrical and telecom
  • Card readers and door locks

Quantities come from the drawings

We read the riser tags and the plan segments and turn them into quantities.

Part of a fire alarm floor plan
Wiring by plan segment
Part of a fire alarm riser diagram
Riser diagram tags

Send us the drawings and we can start

We reply with the scope and schedule first.

CallEmail us