KOEN

Projects

We do not publish client names or contract amounts. Only facility type and scope are listed.

By ECO K KOREA

DateProject
2026.10Container build for separating a UPS battery room
2026.04Rooftop solar on a commercial building in Jeonju, 29.2 kWp, design and construction
2026.04Smart farm glass greenhouse in Hwaseong, Gyeonggi, electrical and solar design
2026.04Factory rooftop solar in Ulsan, 300.16 kWp, construction
2026.02Factory rooftop solar in Jecheon, 129.28 kWp, construction
2026.02Factory rooftop solar in Cheonan, 558 kW (720 W × 775 modules as built; 560.16 kW on the amended license), design and construction

Design by our principal and engineers

FieldExamples
Building electricalFire station annex, performing arts venue, small gymnasium, daycare center remodeling, university lounge
Fire alarm and telecomFire station annex fire alarm and telecom, elementary school electrical and telecom, card readers and door locks
Public infrastructurePublic sewage treatment plant expansion, road improvement electrical design, new road electrical work, utility tunnel fiber optic cable
Switchgear and protectionSwitchgear replacement supervision at schools, protection relay settings, battery room relocation design
Renewable energySolar and ESS design and supervision, wind farm electrical design, overseas solar feasibility study

Work done by our principal and engineers before ECO K KOREA was founded.

Factory rooftop solarESS enclosureEnclosure frameSwitchboard wiringESS enclosure

Send us the drawings and we can start

We reply with the scope and schedule first.

CallEmail us