PVsyst and Solar Pro lectures
Free lessons that follow two yield simulation programs one screen at a time. Each lesson has a video with English subtitles, a summary, screen menu names, key numbers and frequently asked questions.
PVsyst lessons
Follow the yield simulation program PVsyst one screen per lesson, from the first screen to the report. The example used from lesson 1 onward is a virtual rooftop called Example Roof 1 MW. Narration is in Korean with English subtitles (CC).
Lesson 1 · 1 min 40 sFirst screen
What to press when PVsyst opens: Grid-Connected, New, the project…
Lesson 2 · 3 min 11 sWeather data
Reading the PVsyst weather file tables: PVGIS gives 1,412.7 kWh/m² of…
Lesson 3 · 5 min 53 sTilt, azimuth and horizon
In the PVsyst Orientation window the 15° tilt is changed to 0°, 30°…
Lesson 4 · 3 min 36 sModule PAN file
Reading a PVsyst module PAN file on a 645 W bifacial module: rated…
Coming soon: lesson 5 Inverter and modules per string, lesson 6 Strings and DC/AC ratio, lesson 7 Loss inputs, lesson 8 Reading the results, lesson 9 Loss diagram, lesson 10 Report PDF, lesson 11 Comparing variants. One video a day goes up on YouTube, and each one is added here once it is posted.
Solar Pro lessons
Follow Solar Pro 4.8, which calculates shade module by module, from the basics. The virtual 97.2 kW ground mounted plant in Mokpo built in lesson 2 is used throughout. Narration is in Korean with English subtitles (CC).
Lesson 1 · 2 min 9 sFour windows of the first screen
The 3D CAD, I-V curve, energy and economics windows of the Solar Pro…
Lesson 2 · 2 min 25 sFive wizard steps
The five Solar Pro wizard steps, location, module and capacity,…
Lesson 3 · 1 min 41 sChoosing weather data
Choosing a monthly average weather point or an hourly measured CSV…
Lesson 4 · 2 min 36 sBuildings, trees and horizon
Adding a building (corners clockwise), a tree (height and radius) and…
Coming soon: lesson 5 Seeing the shadows, lesson 6 Wiring, lesson 7 I-V curves and shade map, lesson 8 Yearly yield and report, lesson 9 Shading calculation settings, lesson 10 Entering modules and inverters by hand. One video a day goes up on YouTube, and each one is added here once it is posted.
Advanced course preview
Solar Pro project 1 (advanced, in preparation)
A 619 kWp factory roof taken from the 3D scene (36 buildings, rooftop equipment, a 48 point horizon) through winter solstice shadows, shaded modules and wiring, yearly yield, a PVsyst cross check and the client report in ten lessons. The example is a teaching version with the real site name, address and lot number removed. The preview and the full course will be announced here and on the YouTube channel.
Lesson files
Subscribe to our YouTube channel and download the PVsyst lesson cards and the Solar Pro practice file free of charge.