Electrical, fire and telecom BOQ
Send us the drawings and the contract BOQ. We redo the quantity take-off and apply the Korean standard estimating rules.
Scope
| Type | Content |
|---|---|
| Design BOQ | Quantity take-off from design drawings, with unit prices |
| Progress BOQ | Quantities of work done for progress payment claims |
| Change order BOQ | Before and after quantity comparison with increases and decreases |
| As-built BOQ | Final installed quantities for settlement |
| Pre-bid quantity check | Tender BOQ compared with drawing quantities |
What to send us
- Drawings (single line diagrams, floor plans)
- Contract or tender BOQ
- Change instructions (for change orders)
What you receive
- Cost summary and trade summaries
- Trade BOQ, unit cost build-ups and unit price analysis
- Quantity take-off sheets (Excel)
We set the schedule after seeing the documents. Without drawings, we take off quantities after a site visit. We work on projects anywhere in Korea.
How quantities are arranged
An extract from a BOQ, shown as an example.
| Item | Specification | Unit | Qty |
|---|---|---|---|
| Conduit | HI-PVC 16C | m | 1,200 |
| Wire | HFIX 2.5 mm² | m | 3,650 |
| Cable tray | 300 mm wide | m | 86 |
| Panelboard | L-1 | set | 4 |
| LED luminaire | 40 W | ea | 212 |
| Receptacle | Duplex, grounded | ea | 148 |