KOEN

Electrical, fire and telecom BOQ

Send us the drawings and the contract BOQ. We redo the quantity take-off and apply the Korean standard estimating rules.

Scope

TypeContent
Design BOQQuantity take-off from design drawings, with unit prices
Progress BOQQuantities of work done for progress payment claims
Change order BOQBefore and after quantity comparison with increases and decreases
As-built BOQFinal installed quantities for settlement
Pre-bid quantity checkTender BOQ compared with drawing quantities

What to send us

  • Drawings (single line diagrams, floor plans)
  • Contract or tender BOQ
  • Change instructions (for change orders)

What you receive

  • Cost summary and trade summaries
  • Trade BOQ, unit cost build-ups and unit price analysis
  • Quantity take-off sheets (Excel)

We set the schedule after seeing the documents. Without drawings, we take off quantities after a site visit. We work on projects anywhere in Korea.

How quantities are arranged

An extract from a BOQ, shown as an example.

ItemSpecificationUnitQty
ConduitHI-PVC 16Cm1,200
WireHFIX 2.5 mm²m3,650
Cable tray300 mm widem86
PanelboardL-1set4
LED luminaire40 Wea212
ReceptacleDuplex, groundedea148

Send us the drawings and we can start

We reply with the scope and schedule first.

CallEmail us