Construction supervision for power facilities

We check on site that the work follows the design documents, and we handle the paperwork through completion.

Scope

Before construction

  • Design document review
  • Schedule and method statement review
  • Material approval

During construction and completion

  • Site inspection of workmanship
  • Progress verification
  • Completion document review

Supervision our engineers have done

  • Switchgear replacement at schools
  • Solar and ESS design and supervision

Electric Power Technology Supervision Business, Specialized, No. 161 (registered to ECO PLANT). Tell us the project size and procurement terms and we will first confirm whether we can supervise it.

Supervision steps

  1. Design reviewDrawings, calculations and specifications
  2. Material checkRatings and test certificates
  3. Site inspectionWiring, grounding and conduit work
  4. CompletionTest results and as-built documents
Wiring inside a switchboardEnclosure frameInstalled enclosure

Send us the drawings and we can start

We reply with the scope and schedule first.