Protection relay coordination reports

From fault current to setting tables and coordination curves, delivered as one set.

What the report covers

Studies

  • Fault current from the single line diagram and utility (KEPCO) data
  • Short circuit, ground fault and transformer data summarized on page one
  • Equipment rating review

Settings and coordination

  • Interconnection relay elements (overcurrent, ground fault, voltage, frequency)
  • LV air circuit breaker trip units
  • Phase and ground time current coordination curves (TCC)
  • Setting tables ready to enter at the switchgear

Samples

Sample review summary
Review summary
Sample coordination curves
Coordination curves
Sample setting table
Main setting table
Sample combiner box rating review
Combiner box rating review

Send us the drawings and we can start

We reply with the scope and schedule first.