KOEN

Solar panel cleaning payback calculator

Electricity and money lost to soiling each year, and whether cleaning pays.

What the cleaning payback calculator tells you

Soiling (dust, pollen, bird droppings, yellow dust) lowers the output of a solar plant until rain or cleaning removes it. The IEA PVPS Task 13 report estimates a worldwide loss of 3 to 5% of yearly output. The calculator turns your own soiling loss % into the electricity and money lost each year.

With the cleaning cost per visit and the number of visits a year, it shows how many months a cleaning takes to pay back and the break even soiling loss above which cleaning is worth doing. At a glance table shows the same for 1 to 10% loss.

If only one string or one inverter is low, the cause may be a fuse or connector fault rather than soiling. A measured before and after comparison in the same weather is the best way to set the loss %.

Values used and their sources

Checked against the sources (2026-11-11).

ItemValueSource
Soiling loss range3 to 5% of yearly output worldwideIEA PVPS Task 13, IEA-PVPS T13-21:2022 (January 2023)
Specific yield1,169 to 1,367 kWh per kW at 8 Korean sites (roofs about 1,250, south facing ground 1,300 to 1,370)ECO K KOREA PVsyst 8.1.7 simulations, 2026
FormulasEnergy lost = kW × yield × loss %, money lost = energy lost × rate, payback months = cleaning cost per year ÷ monthly lossThis calculator

Regrowth of soiling after cleaning, losses cleaning cannot recover, rate changes and VAT are not included.

Frequently asked questions

How much output do dirty solar panels lose?

The IEA PVPS Task 13 report (IEA-PVPS T13-21:2022, published January 2023) estimates that soiling cuts yearly solar output worldwide by 3 to 5%, with economic losses on the order of 3 to 5 billion euros a year. Dust, bird droppings, pollen and yellow dust, and how often it rains, vary a lot from site to site, so the most accurate value for your plant comes from comparing output before and after cleaning.

How often should panels be cleaned?

Only when the cleaning cost is less than the money lost to soiling. If the real loss is above the break even soiling loss % from this calculator, cleaning is worth it; if below, waiting for rain is better. More cleanings (⑥) mean more cost, so timing them for the dirtiest season (for example heavy pollen or yellow dust with little rain) is most efficient.

What rate should I enter?

If you sell the power, enter the SMP plus REC amount per kWh from your settlement statement. For self consumption, enter the energy rate per kWh of the electricity you avoid buying. Under net metering, enter the rate by which netting lowers your bill.

Send us the drawings and we can start

We reply with the scope and schedule first.

CallEmail us