KOEN

Site feasibility, permitting,
design and supervision

Thirty years of electrical design records,
and we still work on site.

Call +82 1555-2859
22.9 kV incomingSwitchMOFVCBTR 380/220 VACBLV busPowerLightingOutletsPV, ESS
Site boundary Slope over 15°Slope 10 to 15°Slope under 10° RoadHouseSetback line Module layout Permit reviewConditional

We start when you first look at the land

Site feasibility, development permit review, permitting

Hypothetical site, for illustration only.
Aerial rendering of a solar power plant

See the plant in a rendering first

Part of a motor control center wiring diagram drawn with test inputs

Every drawing carries its calculationsEPC electrical design and calculation reports

We check on site that it is built as drawn

Electric Power Technology Supervision Business, Specialized, No. 161 (registered to ECO PLANT)

Quantities come from the drawings

From design to completion, a BOQ with take-off sheets.

The table is an example.

What you receive

Samples built from test inputs, with no client data.

Sample time current coordination curvesProtection relay coordination
Sample panelboard wiring diagramPanelboard diagrams
Sample fire alarm riser diagramFire alarm and telecom

What ECO K KOREA does

ECO K KOREA (주식회사 에코케이코리아) is an electrical and energy engineering company headquartered in Naju, Jeollanam-do, Republic of Korea.

Company factsContactKorean site

Send us the drawings and we can start

+82 1555-2859 info@ecokkorea.co.kr

Send us the drawings and we can start

We reply with the scope and schedule first.

CallEmail us